Double-shaft shredder is a common industrial equipment, often used to shred various large pieces of material. It plays a very important role in the field of industrial production recycling. As a well-known manufacturer of twin-shaft shredders, we will analyze the reasons and solutions for the jamming of the twin shaft shredders.
1.If the discharging speed is too slow in production, the motor load is obviously increased, and the swing of the ammeter pointer deviates from the quota parameter, which can be judged as the equipment blockage caused by the too fast feeding speed. In this case, the feeding mechanism should be adjusted immediately, and the feeding speed of the conveyor belt should be slowed down. The standby device will resume normal operation and then start the fixed feeding. During the period, pay attention to the ammeter pointer to control and set at 85% of the rated current to solve the above problems.
2.The discharging pipeline is not smooth or blocked. Feeding too fast will cause the tuyere to be blocked; improper matching with the conveying equipment will cause the discharging pipeline to weaken or block when there is no wind. After the fault is detected, the delivery port should be cleared and the mismatched conveying equipment should be changed first, and the feed volume should be adjusted to make the equipment operate normally.
3.The hammer head wears severely and aging phenomenon is obvious, the screen hole aperture will cause the output of the double-shaft shredder to decrease, and the feeding demand cannot be met, causing the equipment to block. In this case, the hammer head should be better in time to make the screen hole. Clean up and keep the double shaft shredder in good working condition.
Henan Honest Heavy Machinery : http://www.honestshredder.com/,All rights reserved。
Welcome to visit Henan Honest website. If you want to learn more about our equipments, Contact us Now to find out what we can do for you next project!