The double shaft shredder is fixed on the same main machine and base, and it is a stable main rib. It is necessary to install the grounding level, the motor gear, and ensure the corresponding line of the host to ensure the appropriate belt tensioning stroke, according to the site conditions, assist the installation, without safety hazards and without affecting the normal operation determined by the customer.
Professionals must connect to the power circuit of the machine, and start to check whether the loose parts of the connection system, the bearings and other parts need to be lubricated, whether the treadmill and the labeled steering wheel look consistent before turning, and after the inspection work is completed, only one pass Start the machine slowly.
1. Each part of the double-shaft shredder must be strictly inspected and meet the requirements before starting operation.
2. Power-on sequence: turn on the main power first, and move the machine repeatedly until it starts normally.
3. The materials should be delivered uniformly and at a constant speed, and no metal lumps should enter the feed inlet.
4. During use, the load of the motor cannot be overloaded and maintain normal operation.
5. Before normal operation, in the first cycle of no-load operation, perform a detailed inspection of each component. If there is any abnormality, it should be repaired again in time, and the load will run until the normal load.
6. The blades should be checked frequently, and the rolling mill program must be worn. If the blades are severely worn, they should be replaced in time.
7. Shut down, stop the host first, and then turn off the power. Clean all parts of the device regularly, and replace the bearing lubricant for cleaning, equipment and dust cover, and excessive sun and rain.