Equipment installation process for scrap metal shredder

2022-09-23 17:15:22 By Henan Honest

Metal shredder is a common equipment for processing and recycling waste aluminum materials. The materials processed by metal shredder can be processed in crushers and eddy current equipment. Common processing materials include paint buckets, light and thin materials, refrigerators , cars, scrap steel, car shells, metal scraps, etc. So how about the installation process of metal shredder equipment, today we will take you to introduce the equipment installation process in detail.

1. Installation points of metal shredder frame parts:

a: Metal shredder equipment is equipment that uses cutters to shred materials. During production, due to the large vibration during operation, some pads can be placed between the cement foundation and the frame, such as rubber as vibration buffering materials. . After installation, check the levelness of the rack, and the deviation should be controlled below 2mm. Some customers install the main engine of the metal shredder by digging a pit. Whether it is ground installation or digging resistance installation, it is more convenient.

b: No anchor bolt installation method, the good running balance of the whole metal shredder equipment makes it possible for the crusher to work normally without the installation of anchor bolts. The vibration peak load can be absorbed by the rubber damping block installed at the bottom of the crusher support, thereby reducing the impact force of the crusher on the foundation.

c: The metal shredder should be fixed on a concrete base. If the workplace is changed frequently, the shredder and motor should be mounted on a base made of angle iron to prevent the metal shredder from being damaged by moving back and forth.

2. Horizontal and parallel installation process points

After the main components of the metal shredder equipment are installed, other equipment can be installed. Usually, it can be installed in an active way. The crusher and the motor are installed on the base made of I-beam. The pulley of the main engine and the pulley groove of the motor should be the same, and the outer end face of the pulley should be on the same plane. In this case There is a basis for the activity. When loading, you should stand on one side of the shredder or choose a conveyor to feed the material to prevent the rebounded debris from hurting the face. Do not turn off immediately after the work is over, and run idling for 2-3 minutes to completely discharge the materials in the machine.

Henan Honest Heavy Machinery : http://www.honestshredder.com/,All rights reserved。

Share This News, Choose Your Platform!
Latest News
Related Products

Email: honestshredder@gmail.com

Whatsapp: 0086 15038128697

Add: Zhengzhou, China

Online Talk

Welcome to visit Henan Honest website. If you want to learn more about our equipments, Contact us Now to find out what we can do for you next project!

Name: *
Country:
Email: *
Tel:
Company:
Message: *
Contact Us